(Message inbox/inbox09:5523) Date: Tue, 01 Feb 2005 23:15:41 MST To: thomas@phys.unm.edu cc: "Gregory T. Hicks", jimm@gthicks.com, maccabe@cs.unm.edu, rwhite@computersites.net, tom@computersites.net From: Daniel Dionne Subject: UNM, drawing update
Tim and Team,
Here's my latest drawing along with minor updates to the ID column of Tim's spreadsheet:
(See attached file: UNM 20050201g Dan 0413SK11 all.pdf) (See attached file: UNM 20050201g Dan 0413SK11.dwg) (See attached file: machines-02b.xls)
Comments:
I've not yet received much feedback regarding my drawings. Please feel free to let me know if you see improvements.
It seems that the east/west orientation is working.
For space efficiency, I've placed deep racks in rows D and H.
I expect that I can fit the three Rendering racks into the O row - these are currently obstructing an aisle at P10.
The room is almost full.
I suspect that in order to provide enough air flow, that perforated floor tiles will have to be installed not only at B17 to B22, but also at A17 to A22. This means possible cutting the perf. tiles which are against the wall. I'll run this past Rodney.
Please let me know if you have questions. Thanks,
Dan Dionne, IBM, IPR-Physical Planning
(8-656) 303-773-5821, djdionn@us.ibm.com